

Connect the SAS OUT (expansion) port of controller B on the array to the SAS IN port of expander B on the first expansion shelf.Connect the SAS OUT (expansion) port of controller A on the array to the SAS IN port of expander A on the first expansion shelf.You can daisy-chain up to 3 shelves per bus, Nimble recommend that all flash shelves are cabled direct to the header where possible. Wait at least 3 minutes between connecting each expansion shelf to ensure firmware updates are complete. Connect SAS cables in the order below, repeating steps 3 and 4 for any additional expansion shelves. Once power is connected the storage should come online automatically but failing that there is a power button located on the front of the array.īefore connecting any additional expansion shelves make sure the array and expansion shelves are all powered on. Plug the power cables into both power supplies for the array and any expansion shelves, use separate Power Distribution Units (PDUs) for redundancy. The most common networking topology is likely to be similar to the image below, however with 4 data ports used for each controller (also applicable to Fibre Channel, swapping out for FC switches, ports and HBAs). If you do not have a standard network configuration to follow or are unsure about cabling the array see the Nimble network topology options. For redundancy connect one member of each interface pair to the same switch and the second member to a second switch with the same port configuration.

Fibre Channel or Ethernet, using all available ports where possible. There are 2 built in screws in the front handles to secure the array.Ĭonnect the cables for management and your chosen connectivity protocol, i.e. Slide the chassis into the rack, when you hear a click the chassis is locked into place. If the rack has round holes then use the square-hole adapter and secure into place inside the front and back posts of the rack with the screws included.

#NIMBLE BASE CABINETS INSTALL#
Install the rail assemblies by hooking each rail into the rack and sliding it down to lock into position. Slide the inner rails into the retaining hooks on the side of the chassis and install the set screws to secure in place. Separate the inner rails from the rail assemblies using the catch at the front end of the middle rail.

#NIMBLE BASE CABINETS WINDOWS#
A Windows based computer to run the initialisation and setup.At least 3 static IP addresses for FC setups or 5 for iSCSI.For iSCSI at least 2 additional cat 6 cables and GbE or 10GbE (recommended), for FC at least 2 OM3 or better Fibre channel cables and ports.
#NIMBLE BASE CABINETS FULL#
